Stage size
|
40 X 50 (last lineset)
|
Grid Height
|
80 feet
|
Wing space
|
20 feet per side
|
Upstage area
|
Plus 28’ upstage of last lineset if using staircase for Four
Mortal Men
|
Working linesets
|
60
Fields uses large panels with flowers attached that hangs on two
working batons next to each other
|
Stage floors
|
The stage floor must be resilient wood; the floor cannot be
concrete or wood directly over concrete; if the surface is concrete, the
Presenter must provide a professional dance sub-floor that must cover stage
area from wall to wall. The surface must have any traps leveled, holes
plugged, and no protruding nails or screws. The stage floor or sub-floor must
be covered with a black, Marley-style dance floor.
|
Soft goods provided by house
|
Full set of black legs and border, grey rp, large projection
screen, 2 full stage black panels
|
Recorded or live music
|
Recorded music
|
Lighting
|
The Presenter shall furnish the company a complete inventory
of house lighting equipment The Company shall endeavor to work within the
house instrumentation but any necessary rentals shall be at presenter’s cost.
There should also be enough cable, side arms, C-clamps and color frames to
sufficiently hang the lighting plot.
The
full production utilizes 3 short videos before each section. A FOH projector is required to be provided
by the house.
|
Audio
|
One house speaker system–center cluster and/or house left and
right speakers; two to four backstage monitor speaker; one announce-quality
microphone, separately controlled; one headset communication system, with
seven stations and operable headsets; and one paging system to dressing
rooms.
|
Power
|
Standard
|
Typical set-up schedule
|
Day 1: Hang electrics and goods; Day 2: Focus/finish set up;
Day 3: Cueing/dancers rehearse
|
Personnel
|
Tony Tucci is LD, TD will need to be brought in only for load
in
|
Shipping
|
Bobtail
|