TECHNICAL SPECS
Stage size | 40 X 40 (last lineset) |
Grid height | 80 feet |
Upstage Area | 20 feet per side |
Working Linesets | 10 feet |
Stage Floors | 35 There is one rail cue, a veil placed over two dancers at the beginning is flown out. |
Stage floors | The stage floor must be resilient wood; the floor cannot be concrete or wood directly over concrete; if the surface is concrete, the Presenter must provide a professional dance sub-floor that must cover stage area from wall to wall. The surface must have any traps leveled, holes plugged, and no protruding nails or screws. The stage floor or sub-floor must be covered with a black, Marley-style dance floor. An central area of white marley, approximately 27’ x 27 is required. A strong shop fan is required for opening cues. |
Soft goods provided by house | Full set of black legs and border, grey rp, black scrim |
Recorded or live music | Recorded music |
Lighting | The Presenter shall furnish the company a complete inventory of house lighting equipment. The Company shall endeavor to work within the house instrumentation but any necessary rentals shall be at presenter’s cost. There should also be enough cable, side arms, C-clamps and color frames to sufficiently hang the lighting plot. If full production there are 7 lights boxes 16’ tall x 6’ wide x 3’6” deep. Each box has three circuits of fluorescents. |
Audio | One house speaker system–center cluster and/or house left and right speakers; two to four backstage monitor speaker; one announce-quality microphone, separately controlled; one headset communication system, with seven stations and operable headsets; and one paging system to dressing rooms. |
Power | Standard |
Typical set-up schedule | Day 1: Hang electrics and goods; Day 2: Focus/finish set up; Day 3: Cueing/dancers rehearse |
Personnel | Tony Tucci is LD |
Shipping | Bobtail |